Skip to main content
Total time
8,769 hr
Year
2000
Serial
5436
Location
United States

Specifications

Airframe

Total time
·
8,769 hr
MSN
·
5436
Seats
·
10
Cycles / landings
·
4,603
Pressurized
·
Yes

Powerplant

Engine
·
2×
Engine 1 SMOH
·
8,769 SNEW

Performance (across variants)

Range
·
3,400 nm
Cruise
·
432 kt
Service ceiling
·
45,000 ft
MTOW
·
19,500 kg
Passengers
·
Up to 19

Avionics equipment

  • Collins Pro Line Fusion
  • Honeywell
  • Rockwell Collins

Condition

Used

Airframe

Total Time Since New: 8,769 Hours (as of September 2026) Total Landings Since New: 4,603 Landings Entry Into Service Date: May 2000 Certification Date: November 1999 Program Coverage: Bombardier Smart Parts Plus Maintenance Tracking: Veryon Certification: Currently Operated - FAR Part 135 Always Hangared Total Time: 8,769 Hours Landing Cycles: 4,603 Number of Seats: 10 Pressurized: Yes

Engine

Engines: General Electric CF34-3B Left Engine S/N 872625: 8,769 Hours / 4,603 Cycles Since New Right Engine S/N 872626: 8,769 Hours / 4,603 Cycles Since New Engine Program Coverage: GE OnPoint APU: GTCP36-150, S/N P-638 APU Total Time Since New: 6,992 Hours APU Program Coverage: Honeywell MSP Engine 1 Hours: 8,769 SNEW Engine 2 Hours: 8,769 SNEW

Avionics

Integrated Rockwell Collins Pro Line Fusion Avionics Suite FANS 1/A - Future Air Navigation System Multi-Scan Weather Radar Dual Integrated Electronic Flight Bags SafeFlight Auto Throttles

Interior

Number of Passengers: Ten (10) Galley Location: Forward Forward Cabin Configuration: Four (4) Place Club Aft Cabin Configuration: Two (2) Place Club Opposite Four (4) Place Divan Lavatory Location: Aft Executive Last Refurbished: June 2016 Display Monitors: Forward and Aft Bulkheads Internet: Gogo Avance L5 Internet Year Interior: 2016 Base Paint Color: White Stripe Colors: Blue and Tan/Grey Last Paint Date: September 2018 Year Painted: 2018

Maintenance

Inspection Status: 12 Month: Last Performed May 2026, Next Due May 2027 24 Month: Last Performed May 2026, Next Due May 2028 36 Month: Last Performed May 2026, Next Due May 2029 48 Month: Last Performed June 2024, Next Due June 2028 96 Month: Last Performed June 2024 (with Gear Overhaul), Next Due June 2032 Brochure: View Brochure

Options

Whelan Aerospace Technologies Boom Beam Taxi/Landing Light System Gogo Avance L5 Internet Display Monitors on Forward and Aft Bulkheads

Description

2000 Bombardier Challenger 604 S/N 5436 8,769 Hours; 4,603 Landings Fully Enrolled on Programs Collins Pro Line Fusion Equipped SafeFlight Auto Throttles Same Owner, CAM and MX Supervisor the Past 20 Years Always Hangared Gogo Avance L5 Internet

Comparable sales

Similar aircraft for sale

Browse this model
On request